Intranet Catprocess
  1. news...
  2. about Blackvoxel
  3. download
  4. manual
  5. videos
  6. about us
  1. Mission 29 : Make the metal bar production to run much faster.

    In the previous mission, you made a full automation system for simple metal bar production. Unfortunately, it's very slow as molten metal cubes must cool down before the dematerializer can store them.

    In this mission, we'll make a system for cooling the molten metal cubes automatically that will make the process much more faster.

    With the materializer, we'll make a shower to spray water to molten metal cubes.

    You must build a platform above the conveyor track in order to build the spraying system above the track.

    Use an Atomic Compressor to store water cubes several cubes above the track. You must put the materializer just above the last belt conveyor before dematerializer. Then put a slow materializer just under the Atomic compressor.

    Run the metal bar production and put water in the atomic compressor. Your system will spray water and cool down your metal bar automatically.

    Now, it's much faster and your mission is over.

     

     
  2. Google+